by dinisco | Apr 4, 2021
The Hurld Wyman School resulted from consolidating two outdated smaller schools into one new elementary school as part of the city’s educational masterplan. The project team collaborated with multiple agencies and committees to evaluate four possible locations for the...
by dinisco | Apr 4, 2021
The Angier Elementary School was the oldest school building in Newton still in service as a neighborhood elementary school. A new school was designed as a replacement on the challenging 1.97 acre existing site, predicated on the ability to raise the grade level of a...
by dinisco | Apr 4, 2021
An antiquated, multi-level 50-year old building that could not support a modern middle school program needed to be replaced. The building had no sense of arrival or administrative presence and was saddled with functional problems. The replacement school was built on a...
by dinisco | Apr 4, 2021
Inadequate space and insufficient infrastructure necessitated the replacement of the existing school. Constructing a new school while the existing school was occupied was the most cost effective solution. The overriding design goal was to achieve a symbiotic...
by dinisco | Apr 4, 2021
The Danvers High School project was defined ineffective programmatic spaces, substantial repairs and high operating costs. Despite substantial area, the facility did not accommodate the programmatic needs. Studies recommended the demolition of an addition built in the...
Recent Comments